Skip to content
Railway Prune

Railway Prune

The Railway Professional's Rumour and News Network

Advertisements
Primary Menu
  • Forums
  • Jobs
  • My account
Visit forums
  • Home
  • 2025
  • January
  • 15
  • Passengers make 50,000 journeys on Northumberland Line services in first month
  • Featured
  • UK Railways

Passengers make 50,000 journeys on Northumberland Line services in first month

Adelante 15 January, 2025

Share this:

  • Click to share on Facebook (Opens in new window) Facebook
  • Click to share on X (Opens in new window) X
  • Click to share on LinkedIn (Opens in new window) LinkedIn
  • Click to share on Reddit (Opens in new window) Reddit
  • Click to share on Pinterest (Opens in new window) Pinterest
  • Click to share on Telegram (Opens in new window) Telegram
  • Click to share on Threads (Opens in new window) Threads
  • Click to share on WhatsApp (Opens in new window) WhatsApp
  • Click to share on Mastodon (Opens in new window) Mastodon
  • Click to share on Bluesky (Opens in new window) Bluesky
  • Click to email a link to a friend (Opens in new window) Email
Northumberland Line service in Ashington

Passengers have made more than 50,000 journeys on Northumberland Line services in the first month after the opening.

The line reopened to passengers – for the first time in 60 years – in December, thanks to a £298.5m project involving the Department for Transport, Network Rail, Northumberland County Council and Northern.

Services now call at Newcastle, Manors, Seaton Delaval and Ashington, with a journey along the entire 18-mile route taking around 35 minutes and a single ticket costing no more than £3.

Tickets for more than 50,000 journeys have been bought since the opening and Saturdays have been particularly popular.

That includes more than 3,500 journeys made on the opening day (Sunday, 15 December), when the platform in Ashington was packed with people waiting to catch a glimpse of the first service.

More than 16,000 journeys were then recorded in the first week. 

Paul Henry, programme manager for the Northumberland Line, said: “It has been fantastic to welcome thousands of passengers on board after we spent years planning and preparing for the opening.

“The line is already making such an impact in the region and opening up new opportunities for so many people.”

Glen Sanderson, leader of Northumberland County Council, said: “This is a great milestone to reach after a month of opening and shows just how much need there was for this line which we’ve worked so hard for over the past few years.

“It’s been fantastic to see how popular the service has been over the festive period, as well as those using it every day whether for work or education.

“We’re looking forward to more stations opening in the near future which will no doubt increase passenger numbers even further.”

The maximum peak-time single fare – for the trip from Newcastle to Ashington – is £3 and a return trip costs £6. An off-peak single for the same journey is £2.60 and a return is £5.20.

Northern has worked with Nexus, the public body which runs Tyne and Wear Metro, and Northumberland County Council to provide integrated fares for multi-modal journeys.

Customers can seamlessly switch between Metro and Northern services by using the North East’s Pop ‘Pay As You Go’ system to purchase smart fares.

Northern is running two daytime services an hour on the Northumberland Line from Monday to Saturday and one train per hour in the evenings and on Sundays​.

Passengers travel on Class 158 trains, which have space for bicycles and wheelchairs, accessible toilets, free on-board Wi-Fi and charging points.

New stations in Newsham, Bedlington, Blyth Bebside and Northumberland Park remain under construction and they are due to open this year.

Northern is the second largest train operator in the UK, with 2,500 services a day to more than 500 stations across the North of England.

Continue Reading

Previous: Southeastern Class 707 ‘City Beam’ trains to be fitted with customer toilets
Next: Swietelsky Acquires Harry Needle Railroad Co in Major Deal

Related Stories

large_7arriva-cross-country2
  • CrossCountry
  • Featured
  • RMT

CrossCountry Staff to Begin Overtime Ban Over Rest Day Pay Dispute

Adelante 23 May, 2025
swallow-nameplate-being-prepared-in-neville-hill-depot-lner-lr
  • Featured
  • LNER
  • Rolling Stock

LNER Marks 40 Years of InterCity 225 with First ‘225 Day’ Commemoration

Adelante 22 May, 2025
Mark 4 DVT
  • Featured
  • Incidents & Accidents
  • Transport for Wales

Services Disrupted After Train Strikes Tractor Trailer at Level Crossing in Herefordshire

Adelante 22 May, 2025
Advertisements

Recently Added Jobs

  • Arriva Rail London

    Qualified Train Driver

    • New Cross Gate
    • Arriva Rail London
  • South Western Railway

    Flagship Station Manager

    • London Waterloo
    • South Western Railway
  • LNER

    Customer Experience Host

    • Edinburgh
    • LNER
  • Grand Central

    Senior Conductor

    • Sunderland
    • Grand Central
  • Grand Central

    Senior Conductor

    • Bradford Interchange
    • Grand Central
  • c2c

    Shunt Driver

    • Shoeburyness or East Ham Depots
    • c2c
  • Colas

    OTM Driver/Operator/Fitter

    • Rugby
    • Colas
  • TransPennine Express

    Fraud Investigator

    • York Railway Station
    • TransPennine Express
  • MTR Elizabeth Line

    Qualified Train Driver

    • Old Oak Common
    • MTR Elizabeth Line
  • GB Railfreight

    Trainee Train Manager

    • Didcot
    • GB Railfreight
Advertisements

You May Have Missed

Shrewsbury Depot
  • Infrastructure
  • West Midlands Railway

Shrewsbury Depot Upgraded in £3 Million Investment by West Midlands Railway and Transport for Wales

Adelante 23 May, 2025
SWR South Western Railway Class 444 at Platform 18 sm
  • South Western Railway

South Western Railway Services to Transfer to Public Ownership on 25 May 2025

Adelante 23 May, 2025
London-Gateway-GBRf
  • GBRf

GB Railfreight and Maritime Transport Expand Intermodal Operations with New Services from London Gateway

Adelante 23 May, 2025
Trent Valley line upgrades
  • Avanti West Coast
  • Engineering Works
  • London Northwestern Railway

Trent Valley Line to Close for Nine Days for Major Infrastructure Upgrades

Adelante 23 May, 2025
Advertisements
Advertisements
Advertisements
Copyright © All rights reserved. | MoreNews by AF themes.